after nearly 10 months off the frame, my shoebox is almost one-piece again. redid entire suspension back to stock, but dropped about 4" in front, and 7" in back. also stepped frame 8", and channeled over axle and tunneled. should be in silver and black 2-tone in about 5 or 6 weeks...someday I may sleep... hamb plaque already on firewall